5 critical factors when selecting land for a Data Center

18 September 2025
data center
Table of contents

Introduction to the Data Center Market

The data center market is growing rapidly. By 2030, the global market value is expected to reach $517 billion. Location remains the first and foremost criterion – yet geography alone does not guarantee investment success. Modern data centers demand precise, multidimensional analysis. Real estate professionals must understand the unique requirements of digital infrastructure.

The right land choice determines overall project profitability. Wrong decisions cost millions and lead to years of delays. Professional site evaluation goes far beyond traditional commercial real estate parameters.

Power Infrastructure and Grid Stability

  • Power Demand: Hyperscale data centers may require up to 200 MW – the equivalent of a city’s energy needs.
  • Redundancy: Multiple power sources are essential; a single point of failure disqualifies a site.
  • Grid Modernization: Upgrades may take 5–10 years. Modular substations reduce deployment to 12–18 months.
  • Sustainability: Access to renewable energy is a competitive edge. Power Purchase Agreements (PPAs) ensure long-term green energy supply.

Geology and Soil Conditions

  • Geotechnical Surveys: Load-bearing capacity, drilling, soil sampling, and ground-penetrating radar are essential.
  • Settlement & Tolerances: Even minimal differential settlement can damage IT racks.
  • Groundwater: High levels require dewatering and waterproofing during construction.
  • Seismic Stability: Anti-seismic design protects critical digital infrastructure.

Water Demand and Resource Management

  • Cooling Water Needs: Mid-sized facilities consume hundreds of millions of liters annually.
  • Supply Sources: Potable water, recycled wastewater, or industrial byproducts provide redundancy.
  • Water Use Efficiency (WUE): Average 1.8 L/kWh, with best practices achieving significantly lower rates.
  • Regulatory Framework: EU reporting requirements, local restrictions, and future water scarcity must be accounted for.

Telecommunications Infrastructure

  • Bandwidth Requirements: 100G–800G connectivity, fiber optics, and DWDM technology are standard.
  • Redundancy: Multiple, geographically diverse fiber routes secure resilience.
  • Cabling Standards: OM3–OM5 for short distances, singlemode for backbone connections.
  • Edge & Latency: Site choice depends on application type (AI vs. edge computing).

Physical Security

  • Perimeter Protection: Fences, PAS 68/IWA 14-1 crash barriers, 30 m security standoff.
  • Monitoring: PIDS systems, thermal cameras, biometric access controls.
  • Location Risks: Distance from highways, airports, and chemical plants is crucial.
  • Compliance: ISO 27001, SOC 2, PCI DSS demand documented physical security measures.

Workforce and HR Factors

  • Talent Shortage: Global demand will rise from 2.0 to 2.3 million staff by 2025.
  • Skillsets: Cloud, cybersecurity, and AI integration are highly sought after.
  • Recruitment: Proximity to universities and tech hubs ensures a sustainable talent pipeline.

Conclusion

Choosing land for a data center goes far beyond traditional location analysis. Five core factors – energy, geology, water, telecom, and security – define success. Each requires expert knowledge and months of analysis. A structured, interdisciplinary approach minimizes risks and secures a competitive edge. Investors who prepare for these unique requirements will achieve long-term success in the booming digital infrastructure market.

Share this article

Contact

We look forward to hearing from you

Head Office Poland

ul. Wiślana 8
00-317 Warszawa

+48 22 292 14 57

office@prime-east.com

Office Katowice

ul. Bażantów 35-37/9,
40-668 Katowice

+48 601 631 001

office@prime-east.com

Office Berlin

Kurfürstendamm 11,
10719 Berlin

+49 163 20 911 02

office@prime-east.com

Office Frankfurt

Taunusanlage 8,
60329 Frankfurt am Main

+49 163 2091102

office-de@prime-east.com