Why a Proper Site Assessment is Crucial
Building a data center doesn’t begin with construction – it starts with one simple but critical question:
“Is this site technically, legally, and economically viable for a data center?”
While a plot of land might look promising at first glance, hidden risks such as infrastructure limitations, zoning restrictions, environmental constraints, or topographic challenges can derail even the most ambitious plans.
A well-executed technical due diligence (DD) helps uncover these risks early and provides the data-driven foundation for investment decisions, development planning, and long-term scalability.
What Technical Due Diligence Really Involves
A comprehensive site assessment for a data center goes far beyond surface-level analysis. It includes a thorough review of multiple interrelated factors:
Technical Feasibility
- Analysis of site geometry, buildable area, and functional layout potential
- Early-stage design concepts to test-fit key components (IT halls, transformers, mechanical systems, service roads)
- Preliminary estimates of achievable IT load based on physical area and conceptual layout
Planning & Zoning Conditions
- Review of local land use plans, zoning laws, and permitted uses
- Identification of restrictions such as height limits, buffer zones, protected areas, or environmental overlays
- Assessment of whether the intended use is likely to receive planning approval
Infrastructure & Connectivity
- Initial assessment of electrical grid capacity and potential grid connection points
- Availability of fiber optics, water, sewage, and cooling resources
- Evaluation of road access and logistical feasibility for construction and ongoing operations
Environmental & Surrounding Conditions
- Review of topographic conditions (elevation changes, slopes, drainage)
- Identification of risks such as flooding, soil contamination, noise exposure, or proximity to sensitive areas
- Compatibility with neighboring land uses (e.g., residential zones, nature conservation areas)
The Goal: Clear, Actionable Insights Before You Commit
The objective of our technical due diligence is to provide a realistic picture of what’s possible – and what isn’t.
Our findings help answer essential questions like:
- Can a data center be built on this site without extraordinary technical effort?
- What legal, physical, or logistical constraints must be considered?
- Is this location suitable enough to justify further planning or acquisition steps?
These insights can be used in investor talks, land negotiations, internal decision rounds, or go-to-market strategies.
Tailored Scope – Aligned With Your Project Phase
Not every project requires a full deep-dive from day one. That’s why we tailor our analysis to your current phase:
- Early-stage reviews focus on site viability, buildability, and first estimations of power potential
- Mid-phase assessments dive into legal frameworks, zoning issues, and infrastructure availability
- Advanced validation includes utility provider coordination, permitting strategy, and technical layouts for business case modeling
This flexible structure ensures you receive exactly the information needed – no more, no less – to make the next move with confidence.
Summary – Why Technical Due Diligence Should Never Be Skipped
Data centers are among the most capital-intensive and technically demanding real estate assets.
Without a structured and objective review of the site, developers risk delays, rework, and financial losses.
Our site assessments provide clarity, reduce risk, and create a reliable framework for:
- Site acquisition decisions
- Technical and economic feasibility studies
- Stakeholder alignment and investor confidence
Looking for a site or need to validate a specific location?
We support investors, developers, and operators in evaluating and acquiring sites for hyperscale or edge data centers across Poland, Germany, and Central Europe. With in-depth technical expertise, local market insight, and a hands-on approach, we help move your project forward – intelligently and efficiently.
Your contact:
📧 Wojciech Walczyński – Managing Director